Technology Checklist for an Office Move
What to order, and in what order
Technology is usually the last thing planned in a move and the first thing people notice on day one. Most of the problems come from order: things that take weeks were started days before the move. This list is in the order the decisions need to be made.
As soon as you have an address
Order the internet
This is often the longest wait in the whole project. A fiber circuit to a building that does not already have one can take weeks or months. Order before the lease ink is dry, and ask what the building already has.
Check what you are inheriting
Existing cable may be reusable or may be a mess. Have it looked at before you assume either.
Find the network room
It needs power, cooling, a door that locks and a path for cable. A shelf in a janitor's closet is how equipment dies young.
While the walls and ceilings are open
Cable for desks and printers
Mark every outlet on the floor plan. Two drops per desk is a sensible minimum.
Cable for the ceiling
Wi-Fi access points, cameras, speakers and displays all need cable above the ceiling. It costs far less before the tiles go in.
Cable for the doors
Access control needs cable to each controlled door and often a different lock. Tell the door hardware supplier early.
Conference rooms
Decide where the screen and the table go, then put power and cable there.
Four to six weeks before the move
Phone numbers
Transferring numbers to a new service takes scheduling with the old carrier. Start it now and set the cutover for a quiet day.
Equipment
Order switches, the firewall, access points, cameras and door hardware, and confirm delivery dates.
Old-site obligations
Read the notice periods on internet, phone and alarm contracts at the old address so you are not paying for both longer than needed.
The week of the move
Bring the network up first
Internet, firewall, switches and Wi-Fi go in and are tested before the furniture arrives.
Test from every desk
Plug in at each location. A mislabeled cable is quick to fix now and slow to find later.
Walk it on day one
Have someone on site the first morning for the things nobody thought of.
The mistake we see most
Signing a lease, hiring a mover, and calling about cable and internet three weeks out. By then the ceilings are closed and the internet date is fixed by the carrier. One early conversation avoids most of it.
Related services
See network installation, structured cabling, business internet service, business phone systems.
Moving or building out a space? Bring us in while the walls are still open. We will walk the space and give you a written plan and estimate.
More articles
Copper Phone Lines Are Being Retired
What it means for your fax, alarm and elevator lines
Phone carriers are retiring copper landlines faster after a 2026 FCC rule change. What a business should check now: fax, alarm, elevator and door phone lines.
NDAA-Compliant Security Cameras
Who needs them and how to check what you have
What NDAA Section 889 means for security cameras: which manufacturers are named, who has to comply, and how to check the cameras already on your building.
Cat6, Cat6A or Fiber?
Choosing cable for an office, plant or warehouse
Cat6 vs. Cat6A vs. fiber for a business network: how far each one runs, how fast, what Wi-Fi access points need, and where each belongs in a building.
How Long Should a Business Keep Camera Footage?
Retention, storage and what drives the cost
How long a business should keep security camera footage, what determines how much storage that takes, and how to set retention before the system is sized.